Infrastructure and Environment 2015
Conservation works
- The renovation of the Guardhouse roofs including thermal-modernisation works in the attic
- The conservation of the retaining wall of the moat facing the forefield
- The conservation of the well on the courtyard
- The renovation and conservation of the Pump House and its environs
- The conservation and restoration of paintings, sculptures and handicraft works from the collections of the Museum of King Jan III's Palace in Wilanów
- The upgrade of the roofs in the southern wing of the Palace in Wilanów
- The restoration, reconstruction and the preparation of copies of two vases with swan heads and nods
- The upgrading of the roof over Belvedere
Safety
- Installing a ventilation and air-conditioning system in the 3D Exhibit Rendering Office in the Orangery basement
- The reconstruction and adaptation of the basements in the western part of the Orangery for the purposes of the 3D Exhibit Rendering Office and for the back office for the staff of the Garden Department
- The reconstruction of the existing cold water supply system to adjust it to the fire service in the Fig Tree Conservatory
- Lowering the floor in the Quiet Room and the Three Windows Cabinet, together with the replacement of the electrical wiring
Accessibility
- The extension of the free integrated wireless Internet access (hotspot) in the area of the Wilanów Palace Museum in Wilanów
- Making historical and environmental resources accessible to people with visual and hearing impairments
- Preparing copies of museum exhibits for educational purposes for the historical reconstruction programme “The military camp of King Jan III in Wilanów”